CASE STUDIES

 NIAGARA FALLS 
 ONTARIO 

Mechanical system upgrade in conjunction with the deployment of PlantPRO

 100 QUEEN ST 
 MELBOURNE 

Greater energy efficiency and cost savings through the introduction of  PlantPRO.

 ANU 
 CANBERRA 

Intelligent HVAC Optimisation Solution at Critical Research Facility.

 1 COLLINS ST 
 MELBOURNE 

An innovative approach to plant optimisation has created a virtual economy cycle for a 17-level
commercial office tower in Melbourne’s CBD.

 SHERATON MIRAGE 
 GOLD COAST 

PlantPRO resulted in total energy savings of over $250,000 per annum

 GRAND PLAZA 
 BRISBANE 

Intelligent upgrading of  Grand Plaza shopping centre’s
chiller plant has laid the foundation for a highly efficient chilled water plant.

 WESTFIELD HORNSBY 
 SYDNEY 

M&V study illustrates the positive performance of PlantPRO compared to the previous controls solution.

 FOREST HILL CHASE 
 MELBOURNE 

PlantPRO optimised the operation of the central plant and provided advanced measurement and reporting.

COOLEMAN COURT 
CANBERRA 

Deployment of PlantPRO has helped to achieve a 12.3% reduction in 2017 for energy consumption compared to 2016.

 INNOVATION PLACE 
 SYDNEY 

PlantPRO optimised the operation of the central plant and provided advanced measurement and reporting.

 40 CAMERON AVE 
 CANBERRA 

PlantPRO was deployed to take performance measurements in order identify operational issues.

City Lights
833 COLLINS STREET
 MELBOURNE 

Since the deployment of PlantPRO, the site seen a 30% energy saving compared to the previous year.